Friday, February 3, 2012

Roof, windows, and wrap.

We are now 2 months ahead of the build schedule. Great weather and great workers = big building real soon. So exciting to see the place take shape. I can imagine the 2012 Rodney/Dickenson freshmen walking by (and hopefully in).
Why did I ever doubt this would be a good idea. Look like we have an entrance. The brick will begin in a few weeks and then the place will look slammin'. (say i to the ugly pole)
This pic really gives some perspective of how big the building is. It is over twice the space we had before, though it is all functional. Max height 35'.

Framing (like a month ago)

The BSM construction is moving right along. In the pics below you can see the first floor in being framed. I met the framing crew. They are Amish. They were fun to talk to and very quick workers. In fact, I was not able to get a picture on the 2nd floor framing because they finished in in a matter of days. And you will see in the next post the place is going up fast.

That Utility pole is really an eyesore now.